

Feature/Criteria | Sierra Log and Timber | Competitors (e.g., Monster Plans, Others) |
---|---|---|
Initial Design Retainer Fee | ✅ | ❌ |
Cost of Engineered Plans | ✅ | ❌ |
Plan Modifications (if needed) | ✅ | ❌ |
Transparency & Support
Total Estimated Cost (Standard Engineered Plan) | ✅ | ❌ |
Total Estimated Cost (With Modifications) | ✅ | ❌ |
Key Value Point | ✅ | ❌ |